 |
- Please consult the SK Design
Office before specifying.
- Larger movements and loads can
be accommodated by placing units adjacent to each other to form
a larger plan area.
- Horizontal arrangements are
also possible.
- During casting operations the
P.T.F.E. surfaces must be protected. This is normally achieved
by keeping the two parts of the bearing in contact with each
other as supplied in our packaging.
|